P5 Inline 3D AOI Machine

AI inspection with 3D measurement.

The 3D machine on a single-track conveyor. The same AI inspection, with component height measured rather than inferred.

P5 AOI machine
4-direction projection3D sensor
±6 µm (≈ 0.236 mil)Height accuracy (production parts)
500 × 600 mm (≈ 19.69 × 23.62 in)Max board
Single trackHandling

Full specifications are in the brochure.

The brochure has the complete specifications for every DaoAI model, including optics, board size, clearance and inspection items.

DAOAI AOI BROCHURE

For full details, download our brochure.

Takes 2 minutes. An engineer will follow up.

Hardware specifications are reference values and may vary by configuration.

WHAT IT INSPECTS

Explore our inspection capabilities and plant integration features. Available checks depend on the machine and configuration. This machine also supports DIP / through-hole inspection.

Explore the machine range.

OFFLINE 2D AOI machine
OFFLINE 2DOffline · Manual Load

Offline AOI that runs beside the line — prototypes, small batches, and rework.

Ideal for High-Mix Production
INLINE 2D AOI machine
INLINE 2DInline · Conveyor

Sits in the SMT conveyor line and inspects every board at production speed.

Ideal for Mass Production
3D AOI machine
3DInline · 3D Measurement

Adds height measurement to catch lifted leads, coplanarity, and solder-volume defects.

Ideal for High-Reliability Boards
P5Single track(Viewing)
P5DDual track
THROUGH-HOLE AOI machine
THROUGH-HOLEInline · Wave Line

Built for THT boards: component checks before the wave (A3) and solder-joint inspection after it (A5, A6).

Ideal for DIP & Wave Lines

Frequently asked questions

Does the P5 need XY data or a component library to program?

No. The P5 programs itself from one golden board in 30 seconds to 5 minutes. There is no component library to build or maintain, no XY data is required, and the AI runs on-premise on the machine.

Send us a board and we will tell you which machine it needs.

Half an hour with one of our engineers. Board size, mix and cycle time decide this, not a brochure.

Takes 2 minutes. An engineer will follow up.