A6 Top-and-Bottom Through-Hole (THT) AOI

Both sides, one pass.

AI inspection after wave soldering, top and bottom in one pass. A bottom camera inspects the solder joints and bottom-side SMD parts, and a top camera checks the through-hole components for missing, reversed, offset, damaged and skewed parts. Available for delivery now.

A6 AOI machine
2 × 12 MPCamera
10 / 15 µmResolution
510 × 400 mmMax board
Single laneHandling

Full specifications are in the brochure.

The brochure has the complete specifications for every DaoAI model, including optics, board size, clearance and inspection items.

DAOAI AOI BROCHURE

For full details, download our brochure.

Takes 2 minutes. An engineer will follow up.

Hardware specifications are reference values and may vary by configuration.

WHAT IT INSPECTS

Explore our inspection capabilities and plant integration features. Available checks depend on the machine and configuration.

Explore the machine range.

OFFLINE 2D AOI machine
OFFLINE 2DOffline · Manual Load

Benchtop AOI that runs beside the line — prototypes, small batches, and rework.

Ideal for High-Mix Production
INLINE 2D AOI machine
INLINE 2DInline · Conveyor

Sits in the SMT conveyor line and inspects every board at production speed.

Ideal for Mass Production
3D AOI machine
3DInline · 3D Measurement

Adds height measurement to catch lifted leads, coplanarity, and solder-volume defects.

Ideal for High-Reliability Boards
THROUGH-HOLE AOI machine
THROUGH-HOLEInline · Wave Line

Built for THT boards: pin and component checks before the wave (A3) and solder-joint inspection after it (A5, A6).

Ideal for DIP & Wave Lines

Frequently asked questions

Does the A6 need CAD data to program?

No. Like every DaoAI machine, the A6 programs itself from one golden board in 30 seconds to 5 minutes. No CAD, Gerber, centroid file or component library is required, and the AI runs on-premise on the machine.

Send us a board and we will tell you which machine it needs.

Half an hour with one of our engineers. Board size, mix and cycle time decide this, not a brochure.

Takes 2 minutes. An engineer will follow up.