A3 Through-Hole (THT) AOI

Built for the through-hole line.

AI inspection of through-hole components before wave or selective soldering. A top camera images the component side, and dedicated AI algorithms detect wrong, missing, reversed and skewed parts. Solder joints are inspected after the wave by the A5 and A6.

DaoAI A3 pre-wave through-hole AOI
26 MPCamera
Top 80 mm (3.15 in)Clearance
420 × 420 mmMax board
Straddles the lineHandling

Full specifications are in the brochure.

The brochure has the complete specifications for every DaoAI model, including optics, board size, clearance and inspection items.

DAOAI AOI BROCHURE

For full details, download our brochure.

Takes 2 minutes. An engineer will follow up.

Hardware specifications are reference values and may vary by configuration.

WHAT IT INSPECTS

Explore our inspection capabilities and plant integration features. Available checks depend on the machine and configuration.

Explore the machine range.

OFFLINE 2D AOI machine
OFFLINE 2DOffline · Manual Load

Offline AOI that runs beside the line — prototypes, small batches, and rework.

Ideal for High-Mix Production
INLINE 2D AOI machine
INLINE 2DInline · Conveyor

Sits in the SMT conveyor line and inspects every board at production speed.

Ideal for Mass Production
3D AOI machine
3DInline · 3D Measurement

Adds height measurement to catch lifted leads, coplanarity, and solder-volume defects.

Ideal for High-Reliability Boards
THROUGH-HOLE AOI machine
THROUGH-HOLEInline · Wave Line

Built for THT boards: component checks before the wave (A3) and solder-joint inspection after it (A5, A6).

Ideal for DIP & Wave Lines
A3Pre-wave · component check(Viewing)
A5Post-wave · solder sideA6Post-wave · top + bottom

Frequently asked questions

Does the A3 need a component library?

No. The A3 is set up from one known-good board, with no component library to build or maintain, and the AI runs on-premise on the machine.

Send us a board and we will tell you which machine it needs.

Half an hour with one of our engineers. Board size, mix and cycle time decide this, not a brochure.

Takes 2 minutes. An engineer will follow up.